Buildings Accounts ?

Insights — how the buildings were made, and how to check them

One person's rendering of public records, not the Washington State Convention Center Public Facilities District's, the State Auditor's, or an accounting firm's. Accuracy is not guaranteed. Every figure opens the page it was read from, so check the number against the page.

Counts as of 2026-09-13.

What the buildings hold

Floor plans2the District's booklets for the Arch (2024-01-22, 12 pages) and the Summit (2026-04-13, 16 pages), registered as documents with every page rendered
Event log1the District's own log, produced with the facility-utilization records response of 2026-05-15
Events952
Bookings13,946one event in one space over its dates
Utilization figures36occupied, live and available square-foot-days, by building and year

How it was built

Every square footage, dimension, ceiling height and capacity comes from the two floor-plan booklets, read from the tables printed under each floor drawing, as figures on a page like any other. The event log and the booklets were joined at research time into one denormalized table of who booked which space on which day, and the buildings book is seeded from that.

The rest is derived and regenerated from the loaded data. The Arch is two structures, 705 Pike and 800 Pike, joined by a skybridge and a truck bridge, and the booklet draws them on separate pages, so each floor is one row per structure. Combination names the log uses but the plan does not, Hall 4ABCD or Room 345-346, are given the floor their parts are on, and which spaces are made of which other spaces is recorded so available area is a query rather than a hard-coded number. The Arch's five circulation zones, each with its own entrance and 800 Pike drawn as two, the Tahoma level and the floors with the street door, are drawn as zones. Use by floor and use by zone are both built from the same day-level rows.

What is not settled

How to check a figure

Click any floor or space and the page of the booklet that draws it opens, at full size, with the booklet's title, date and page number, and the capacity table read off that page. Occupancy figures trace to the event log by event and space. The booklets and the log are public records of the District; they are not hosted here, and the citation tells you which one to ask for.

The rows themselves are readable one table at a time, at /api/data/zones/ and the like, read-only. The database schema and the queries are shown; the generator that produced the pages is not published.

Built by Ivan Schneider. The reporting on the convention center is at dispatch.conventioncityseattle.com; the front door is conventioncityseattle.com.